Advertisement

We need your help now

Support from readers like you keeps The Journal open.

You are visiting us because we have something you value. Independent, unbiased news that tells the truth. Advertising revenue goes some way to support our mission, but this year it has not been enough.

If you've seen value in our reporting, please contribute what you can, so we can continue to produce accurate and meaningful journalism. For everyone who needs it.

Contaminated

Fukushima leak upgraded to a "serious incident"

The nuclear regulator in Japan had originally given it a rating of Level 1, an ‘anomaly’.

JAPAN’S NUCLEAR REGULATOR has upgraded the rating of a leak of radiation-contaminated water at its tsunami-wrecked nuclear plant to a “serious incident” on an international scale.

The Nuclear Regulation Authority originally gave a Level 1 rating — an “anomaly,” to the August 19 leak of 300 tons of water from a tank at the Fukushima Dai-ichi nuclear plant.

Last week it proposed raising that to Level 3 — a “serious incident” — and it made that change after consulting with the International Atomic Energy Agency.

Ratings

image

Weeds grow through cracks in an earthquake-damaged road in the abandoned town of Naraha, which was once inside the nuclear exclusion zone surrounding Fukushima Dai-ichi nuclear plant. Pic: Greg Baker/AP/Press Association Images

The ratings are designed to inform the international community, and changing them does not affect efforts to clean up the leak by the government and plant operator Tokyo Electric Power Co.

The 2011 Fukushima disaster itself was rated the maximum of 7 on the IAEA’s International Nuclear and Radiological Events Scale, the same as the 1986 Chernobyl accident.

TEPCO has recovered some of the water that leaked from the tank but says some of it may have reached the sea through a rainwater gutter.

TEPCO has built hundreds of tanks to hold radioactive water, some of which is ground water that made its way to the plant, but hundreds more tons of contaminated water are believed to be entering the sea each day.

The plant suffered triple meltdowns after the massive earthquake and tsunami in March 2011. TEPCO is spraying tons of water into its reactors to cool them and is struggling to contain the resulting waste water.

Japan’s industry minister said this week that the government will take over cleanup efforts.

Read: Japan upgrades Fukushima leak to highest level in two years>

Author
Associated Foreign Press
Your Voice
Readers Comments
14
    Submit a report
    Please help us understand how this comment violates our community guidelines.
    Thank you for the feedback
    Your feedback has been sent to our team for review.